How T.E.S IT-SOLUTIONS Sources, Tests and Ships Data-Center Hardware

· Updated · 6 min read · Itzhak Finkelstein, T.E.S IT-SOLUTIONS

Tidy workshop bench with an open 1U switch, bagged adapter cards and bins of coiled copper cables, shelving behind

T.E.S IT-SOLUTIONS buys end-of-life data-center equipment as raw material, recovers it in four lanes, builds each product to a bill of materials and your work order, tests it, and ships it from Haifa, Israel. Handling takes 1-3 business days. Standard international shipping is estimated at 8-13 business days, and traceable EMS at 4-7. T.E.S IT-SOLUTIONS is an independent manufacturer by requirement and is not affiliated with the original makers.

The flow at a glance

Intake, recovery and buildThe three stages of the production flow from the table: Intake (electronic scrap, receiving, sort and catalogue, inspection), Recovery (boards and cards, chassis, power supplies and fans, cables) and Build (assembly, firmware and OS, final test, tested product), each with what happens.StageStepsWhat happensIntakeElectronic scrap,receiving, sortand catalogue,inspectionEquipment arrives as rawmaterial, then iscatalogued, inspected andsplit by part typeRecoveryBoards and cards,chassis, powersupplies andfans, cablesEach part type has its ownlaneBuildAssembly,firmware and OS,final test,tested productEach product is built toits bill of materials andyour work orderIntake, recovery and buildThe three stages of the production flow from the table: Intake (electronic scrap, receiving, sort and catalogue, inspection), Recovery (boards and cards, chassis, power supplies and fans, cables) and Build (assembly, firmware and OS, final test, tested product), each with what happens.Intake→ Electronic scrap, receiving, sort and catalogue, inspection→Equipment arrives as raw material, then iscatalogued, inspected and split by parttypeRecovery→ Boards and cards, chassis, power supplies and fans, cables→Each part type has its own laneBuild→ Assembly, firmware and OS, final test, tested product→Each product is built to its bill ofmaterials and your work order
Each stage, its steps, and what happens to the equipment.

The production flow has 4 intake steps, 4 recovery lanes and 4 build steps. Intake and build run in order. The recovery lanes run side by side.

StageStepsWhat happens
IntakeElectronic scrap, receiving, sort and catalogue, inspectionEquipment arrives as raw material, then is catalogued, inspected and split by part type
RecoveryBoards and cards, chassis, power supplies and fans, cablesEach part type has its own lane
BuildAssembly, firmware and OS, final test, tested productEach product is built to its bill of materials and your work order

The full version, with a drawing of each step, is on how we build.

Sourcing: end-of-life equipment as raw material

About 95% end-of-life electronicsAbout 95% of our raw material is end-of-life electronics, by our own estimate.about 95%of our raw material is end-of-lifeelectronics (our own estimate)About 95% end-of-life electronicsAbout 95% of our raw material is end-of-life electronics, by our own estimate.about 95%of our raw material is end-of-lifeelectronics (our own estimate)
Share of raw material from end-of-life electronics, by our own estimate.

T.E.S IT-SOLUTIONS is part of T.E.S Group, which buys unused and discarded electronic equipment from mid-size and large companies. Data-center hardware is often retired on a refresh schedule. About 95% of our raw material, by our own estimate, is end-of-life electronics.

The equipment arrives as raw material. Nothing is sold until it is rebuilt and tested. Each item is identified and recorded in inventory, against years of part numbers, firmware versions, airflow variants and repair records in our database. Each item is then checked for damage and split by part type.

Recovery: four lanes

The four recovery lanesBoards and cards, chassis, power supplies and fans, and cables, each with what happens to it.Boards and cardsCards are repairedand rebuilt.ChassisChassis from scrappedswitches aremetal-worked,finished andrepainted.Power supplies andfansThese areremanufactured, so aswitch can take thepower and airflow itswork order calls for.CablesCable and connectors(SFP, QSFP, QSFP56,QSFP112) arerecovered for copperand fiber, active andpassive cables.The four recovery lanesBoards and cards, chassis, power supplies and fans, and cables, each with what happens to it.Boards and cardsCards are repaired and rebuilt.ChassisChassis from scrapped switches are metal-worked,finished and repainted.Power supplies and fansThese are remanufactured, so a switch can takethe power and airflow its work order calls for.CablesCable and connectors (SFP, QSFP, QSFP56,QSFP112) are recovered for copper and fiber,active and passive cables.
Each part type has its own recovery lane.
LaneWhat happens
Boards and cardsCards are repaired and rebuilt. A card that cannot be repaired gives its working components to other cards.
ChassisChassis from scrapped switches are metal-worked, finished and repainted.
Power supplies and fansThese are remanufactured, so a switch can take the power and airflow its work order calls for.
CablesCable and connectors (SFP, QSFP, QSFP56, QSFP112) are recovered for copper and fiber, active and passive cables.

The bench work is low-tech: inspection, soldering, metalwork, paint and assembly. The knowledge behind it sits in the database, with AI tools and large language models on top of that data.

Build: to the work order

Each product is built to its own bill of materials and your work order. Then the compatible firmware and the right operating system are loaded. We work them out from our database. Here is what you can specify.

ProductYou can specify
SwitchModel, or the ports and speed you need. Airflow direction, including reverse. Power supplies and fans. Firmware and operating system.
Adapter cardSpeed and ports, from 10 to 400Gb/s. Tall or short bracket. The firmware version your fleet runs. Cables needed with the card.
CableSpeed, from 10 to 800Gb/s. Exact length. Copper or fiber, active or passive. Connector. Ethernet or InfiniBand.

An order runs through six steps: requirement, quote, bill of materials, build, final test and shipment. The quote gives the price, the configuration for your approval and the lead time for your build. See build to order for how it works.

Testing: what is checked before shipment

The final test list depends on the product. Where it says "where available", the check depends on having test equipment for that model.

1U switch on a test bench with short copper cables looped between neighbouring QSFP28 ports
  • Switches: power supply and fan status, airflow direction against the part number, port inspection and port health check, firmware and management interface, and a link test where a test setup is available.
  • Adapter cards: visual inspection of the card, ports and bracket, part number and device identity against the label, firmware version identified, PCIe detection, and a link test where a test setup for the card is available.
  • Copper cables: connector and latch inspection, label, part number and length, jacket and physical condition, and an electrical test where a test setup for the cable type is available.
  • Active optical cables: connector inspection, label, part number and length, physical condition, and a link test where a test setup is available.
  • Transceivers: housing and connector inspection, optical end-face inspection, part number and identity (EEPROM), and a link test where a test setup is available.
  • Spares such as fans and power supplies: part number against the label, physical inspection, and a function check where a test setup is available.
  • SSDs, memory and other listings: part number against the label, and physical inspection.

For one product line in detail, read how we rebuild and test a network switch. You can ask us for the record of a specific unit. For what to ask on SSDs and memory, see what is tested and when it makes sense.

Examples by product line

Airflow is the clearest example of a work-order item. In our catalog, the MSN2700-CS2F has P2C airflow and the MSN2700-CS2R has C2P airflow. Fans and power supplies come in matching directions, such as the MTEF-FANF-A fan and the MTEF-PSF-AC-A power supply, both P2C. Check each spare's own page for the switches it fits. The airflow guide explains how to read them.

Adapter cards such as the MCX556A-ECAT go through the boards and cards lane. Cables and optics such as the MCP1600-C003, MFA1A00-C030 and MMA1B00-C100D get the checks listed above for their type.

Shipping, customs and warranty

Shipping time from HaifaStandard international shipping is estimated at 8 to 13 business days. Traceable EMS is estimated at 4 to 7 business days. Handling of 1-3 business days comes first.Standard internationalTraceable EMSFastest8 days4 daysSlowest13 days7 daysBusiness days, estimates. Handling of 1-3 business days comes before shipping.Shipping time from HaifaStandard international shipping is estimated at 8 to 13 business days. Traceable EMS is estimated at 4 to 7 business days. Handling of 1-3 business days comes first.Standard internationalTraceable EMSFastest8 days4 daysSlowest13 days7 daysBusiness days, estimates. Handling of 1-3 business dayscomes before shipping.
Estimated business days in transit, fastest and slowest, for each shipping option.
ItemTerms
Ships fromHaifa, Israel, worldwide
Handling1-3 business days
Standard international shipping8-13 business days (estimate)
Traceable EMS4-7 business days (estimate)
Warranty30 days
ReturnsWithin 30 calendar days of receipt, unused and in original packaging. The buyer pays return shipping.
Customs and import taxesPaid by the buyer
VATConfirmed with the quote or order
PricesIn EUR. Volume and unlisted parts by quote.

Send a part number or a requirement through our contact page. A unit built to order gets its own lead time in the quote, so the handling figure above may not apply to it.

What this process does NOT include

  • A maker's warranty or support. T.E.S IT-SOLUTIONS is independent. Products are compatible with, and remanufactured from, equipment originally made by NVIDIA, Cisco, Juniper and others. T.E.S IT-SOLUTIONS is not one of those makers and is not their partner.
  • Certificates, customer references or output figures. We do not publish any here.
  • A link test on every unit. Link and electrical tests depend on having a setup for that model. Ask whether the test ran on your unit.
  • Listings marked New. The flow above describes recovered units. A listing marked New describes itself as factory-sealed on its page.
  • Confirmation that a part fits your system. That depends on your platform, firmware and switch vendor policy. Confirm it for your own system.

Sources: NVIDIA SN2000 switch manual: ordering information; replacement parts; NVIDIA ConnectX-5 adapter manual (PDF); ConnectX-5 firmware release notes: validated cables (PDF).

Parts we stock

Parts in this post

These are examples of what comes out of the flow. Browse the full lines: switches, adapter cards, interconnect, power supplies and fans.

FAQ

Where does T.E.S IT-SOLUTIONS get its raw material?

T.E.S Group buys unused and discarded electronic equipment from mid-size and large companies. About 95% of the raw material, by our own estimate, is end-of-life electronics. It arrives as raw material, and each item is identified, recorded in inventory and inspected before it enters a recovery lane.

Is every unit tested before it ships?

Every switch, adapter card and cable gets a final test before shipment, using the check list for its type. Link and electrical tests are marked "where available", because they depend on test equipment for that model. SSDs, memory and other listings have a shorter list: part number against the label, and physical inspection.

Can I order a specific airflow or firmware version?

Yes. Switches are configured per order for airflow direction, power supplies, fans, firmware and operating system. For an adapter card, we load the firmware version your fleet runs. Send the requirement, and the quote returns the configuration for your approval and the lead time for your build.

Is T.E.S IT-SOLUTIONS part of NVIDIA or another maker?

No. T.E.S IT-SOLUTIONS is an independent manufacturer by requirement, based in Haifa, Israel. It remanufactures products from equipment originally made by NVIDIA, Cisco, Juniper and others, and it is not affiliated with them. Ask the original maker what its warranty or support covers.

All posts · Shop by product line